Geggus GmbH

76356 Weingarten

Project

Construction, conversion, expansion

Project info

  1. Building section: conversion and new construction;
  2. Building section: construction of a new production hall;
  3. Building section: construction of a new 2-storey office building and expansion of the production hall to the existing hall System
  • North-facing buildings with roof skylights for optimum exploitation of daylight.
  • Steel supporting structure integrated in the skylight.
  • Flat, gravelled roof (protection against heat in summer).
  • Façade elements made form aerated concrete with curtain wall made from troughed sheets.
  • Façade of the office wing as before, but with outer shell as a curtain wall in Alu-Cobond.

The client’s specifications: Optimisation of material flows, “transparent production,” procurement, technology, showrooms, etc. close to the production line. Generously dimensioned and functional communal facilities for the workforce were realised.

 

back to overview